Do I need planning permission?
Many extensions and loft conversions in England don't need a planning application. They're allowed under permitted development, as long as they stay within set limits.
Last checked 20 October 2026 · England only. Flats, maisonettes, listed buildings and houses where the council has removed permitted development rights always need checking.
Extensions under permitted development
Single-storey rear extensions
- Up to 3 metres beyond the original rear wall for most houses, or 4 metres for detached houses.
- Up to 6 metres (other houses) or 8 metres (detached) if you notify the council through a prior approval application first. This isn't available on designated land or Sites of Special Scientific Interest.
- No more than 4 metres high.
Rules for every extension
- Not higher than the highest part of the existing roof, and eaves not higher than the existing eaves.
- Within 2 metres of a boundary, eaves no higher than 3 metres.
- Extensions and outbuildings can cover no more than half the land around the original house.
- Outside materials should look similar to the existing house.
Side and two-storey extensions
- Side extensions: single storey, no more than 4 metres high, and no wider than half the width of the original house.
- Two-storey rear extensions: no more than 3 metres beyond the original rear wall, and at least 7 metres from the boundary opposite the rear wall. Upper-floor side windows must be obscure-glazed and fixed shut below 1.7 metres.
"Original house" means the house as it was first built, or as it stood on 1 July 1948 if older. Earlier extensions count towards the limits.
Loft conversions under permitted development
- Extra roof space of up to 40 cubic metres for terraced houses and 50 cubic metres for other houses (including any earlier roof extensions).
- Nothing beyond the slope of the roof at the front of the house facing a road, and nothing higher than the existing roof.
- Dormers set back at least 20 cm from the original eaves where practicable.
- Side-facing windows obscure-glazed, with any opening part at least 1.7 metres above the floor.
- No balconies, verandas or raised platforms (a Juliet balcony is normally fine).
When you will need planning permission
- Your plans go beyond any of the limits above.
- The house is in a conservation area, National Park, National Landscape (Area of Outstanding Natural Beauty), the Broads or a World Heritage Site. Side extensions and two-storey rear extensions there need permission, cladding isn't allowed, and loft conversions aren't permitted development.
- It's a flat or maisonette, or a listed building (which also needs listed building consent).
- The council has removed permitted development rights for your house (check the original planning permission or ask the council).
Getting certainty
Even when you think permitted development applies, you can apply to the council for a Lawful Development Certificate. It isn't compulsory, but it proves the work was lawful, which buyers' solicitors often ask for.
Permitted development is only about planning. You'll still need Building Regulations approval, and possibly Party Wall notices.